01 Hei · Oslo

Plans people
can check.

I make complex industrial projects legible—scope, schedule, cost and risk turned into something a team can use and leadership can act on.

Open to work Oslo · 2026
01 Scope What has to land
02 Schedule When it can land
03 Decision What happens next

The controls person teams can actually talk to.

Permit
May 2027
Norwegian
A2–B1 · improving

02 The numbers

Six instruments.
One operating picture.

Not decorative counters. Each measure shows the operational change behind it.

Forecast accuracyQuantafuel
+30%
Before
After

Integrated planning made the confidence band smaller and the decision clearer.

Resource usePortfolio
+50%

One resource model became the planning backbone.

Reporting turnaroundPMO
20% faster
Old cycle New

Less time assembling updates; more time available for decisions.

Portfolio30+ pipeline · 12+ active
Actively scheduled Pipeline
People trainedOmega365
50+

Training was part of delivery, not an afterthought.

Largest modificationSkive, DK
£10M
0510

The model outlived the project and served the portfolio.

03 Project dossiers

Four cases.
Different control problems.

The portfolio goes deeper on the work that best proves delivery, systems adoption, and judgment.

Biogas · Norway + Sweden2026

One existing plant. One blank sheet.

Two 150,000 t/yr assets needed the same controls discipline without pretending the same plan would fit both.

BrownfieldVestBuild around what is running
GreenfieldMalmBuild the case from zero
Control
Scope · schedule · cost · risk
Lifecycle
Engineering → production
Scale
2 × 150k t/yr

04 Career route

Lucknow to Oslo.
One control thread.

The roles change; the through-line does not: make complex work visible enough for people to decide and deliver.

2012–16Power Electronics

Project coordination and delivery foundations.

2016–22Rationale Energy

Owner-side PMO, controls and operating systems.

2022–24BI · Eyvon · Vulkaza

Digital business alongside Nordic delivery work.

2024–26Quantafuel

Portfolio planning, reporting and system adoption.

2026Antec Biogas

Brownfield and greenfield controls in Norway.

Study in parallelMechanical Engineering · 2012–16Digital Business · 2022–25

05 After hours · Systems lab

I gave a team of AI agents
a project manager.

Six owned systems, governed as one ecosystem. Select a node to see the rule behind it.

Main system · One layer of truth

Weaveplane

A project's method lives in one place, so every connected tool reads the same truth instead of keeping a private copy and quietly drifting.

Problem
Method drift across tools
Rule
One canonical source
Control
Human approval at decisions
Visit Weaveplane

06 My operating system

Six moves.
One example all the way through.

The Omega365 migration follows the complete route—from understanding the real constraint to improving the system after adoption.

01 / Understand

Audit what is actually there.

Who decides, what constrains the work, and what the schedule is really carrying—not what the process document says it carries.

Omega PIMSTool auditUser needs

07 The person

The part a CV
cannot show.

Principles are only useful here when a named person or a specific behaviour can carry the claim.

Corroborated · René Ortiz

Transparency

Numbers people can check beat numbers people must trust.

“Measurable KPIs and clear accountability structures.”
Corroborated · René Ortiz

Structure that serves

A plan should help a team decide, not just record what they did.

Corroborated · Jaime Arenillas

Respect

People contribute more when it is safe to disagree.

Behaviour · Oslo vs Denmark

Integrity

A decision has to be workable and defensible.

Managed, not hidden

One thing I correct

I say yes too readily. The fix is to scope the help before absorbing the whole problem.

08 Recommendations

Three perspectives.
One repeated signal.

Manager, people and peer evidence is kept separate from my own description of how I operate.

01 · Manager

“Measurable KPIs and clear accountability structures.”

René Ortiz · manager perspective
02 · People

Creates trust by making progress and ownership visible.

HR / people perspective
03 · Peer

Respectful collaboration—especially when viewpoints differ.

Jaime Arenillas · peer perspective
What repeatsClear accountability · visible progress · respectful disagreement

09 Handover

Looking for
the next one.

Project controls, PMO and delivery systems—where planning meets people and the work needs to be visible enough to challenge.

Track A

Nordic + international

English-language organisations where project controls, digital systems and quantified delivery matter now.

Track B

Norwegian controls

Consultancies and operators where Omega365, OPC and owner-side controls carry a premium. Norwegian A2–B1, actively improving.